Download the Products Catalog Right Now!
CALL: +86 18055363998
Machine Specifications
| MODEL | punching pressure(T) | max.cutting thickness of steel plate | plate strength(N/mm²) | Angle of shear(º) | A trip size (T*W)(mm) | Slider trip(mm) | Trips frequency(times/min) | Throat depth (mm) | Punch depth (mm) | Max punching diameter (mm) | Main Motor Power(kw) | Overall Dimensions L*W*H(mm) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Q35Y-12 | 35 | 12 | ≤450 | 7° | 12×160 6×300 | 35 | 10-18 | 115 | 12 | 25 | 4 | 950×550×1800 |
| Q35Y-16 | 60 | 16 | ≤450 | 7° | 16×250 8×400 | 80 | 11-20 | 300 | 16 | 25 | 5.5 | 1740×810×1830 |
| Q35Y-20 | 90 | 20 | ≤450 | 8° | 20×330 10×480 | 80 | 8-18 | 355 | 20 | 30 | 7.5 | 1950×900×1950 |
| Q35Y-25 | 120 | 25 | ≤450 | 8° | 25*330 16*600 | 80 | 6-16 | 400 | 25 | 35 | 11 | 2355×960×2090 |
| Q35Y-30 | 160 | 30 | ≤450 | 8° | 30×335 20×600 | 80 | 6-16 | 600 | 28 | 38 | 15 | 2800×1050×2450 |
| Q35Y-40 | 200 | 40 | ≤450 | 8° | 40*335 30*600 | 100 | 6-16 | 530 | 35 | 40 | 18.5 | 2900×1100×2500 |
| Q35Y-50 | 250 | 50 | ≤450 | 8° | 50×300 30×750 | 100 | 6-12 | 600 | 40 | 45 | 18.5 | 3200×1440×2500 |
Operating Steps
- Power Supply Check: Confirm the main power supply voltage is stable and there is no phase loss. Check that the leakage current device (RCD) and circuit breaker are functioning properly and in the normal closed state.
- Equipment Wiring: Open the door of the electrical wiring cabinet on the punching and shearing machine. Next, make sure to connect the power cord correctly. After completing the wiring, close and lock the cabinet door.
- Power-on Test: Connect the power supply. Step on the foot switch to test the equipment. If the machine does not operate, first try swapping the phase sequence of any two power cords, then check if the emergency stop switch on the equipment has been rotated to its reset position (in the open position).
- Foot Switch Confirmation: Check the foot switch connection individually to ensure it is secure and that its triggering and reset functions are normal and without jamming.
- Die Change Safety Regulations: Before performing any die change, adjustment, or maintenance, the equipment power must be completely turned off and ensure it is in an unstartable state.
- Work Completion and Finishing: After completing the work, perform the following steps in sequence: Turn off the equipment control switch. Disconnect the main power switch. Unplug the power cord from the socket. Clean up all debris and contaminants from the equipment and work area.
Application industry
- Steel structure processing
- Elevator car and parts processing
- Trailer—spare tire parts, trailer hinges, plate hooks, inserts, and tiles
- Construction machinery industry—processing on belt conveyors and mixing stations
- Agricultural and animal husbandry machinery industry—Threshing machine frame, trailer body parts processing
- Food industry machinery—slaughter equipment frames and parts processing
- Processing of high and low voltage tower parts
- Wind power generation equipment—parts processing for stairs and pedals on wind power generation towers
- Mechanical processing—Processing of building embedded parts/conveyor brackets and other components that serve as connections
- Grain machinery—grain and oil equipment, starch equipment brackets, shells, and small parts processing
- Railway trucks/cars, crane parts processing
- Shearing, punching, and bending of channel steel, square steel, round steel, H steel, I-beam, and other steel materials
Contact Us Now!
GET SOCIAL
+86 18055363998
ADDRESS
Qingshui Industrial Park, Qingshui Street, Wuhu Disrtict, China(Anhui)
News
Applicable Industries
Automobile making
Metal processing plant
Construction industry


